1. Local service_ Local service and warehouse in Europe and Australia
2. Quality verified_ 5 years warranty; 19 years experience on beer equipment manufacturing
3. Transaction security_ More than 1100+ brewery project all over the world
4. One stop service _ Pre sale + Design + Production +Installation
5. Certification guarantee _ With ISO, CE, design and produce by ASME standard available
_ Adopted Stainless steel SUS 304, the tanks’ quality meet GB/CE/PED/ASME standard.
_ Interior polished to 0.2-0.4 μm to ensure no dead corner for bacteria hidding.
_ Two vessel brewhouse based on Mash/lauter tun + Kettle/whirlpool tun + Hot liquor tank
_ Suitable for brewing 1~2 batches/day; first batch takes about 8 hours, and two batches of 14 hours are allowed;
_ All certificated SUS304 stainless steel, easy to clean; Copper cladding for special environments such as bars;
_ Steam heated, high thermal efficiency, gentle for wort; Electric or direct fire heating available;
_ Two stage wort cooling, city water for 1st stage and glycol water for 2nd stage;
_ Mashing heating and fermentation cooling automatically controlled, and manual control allowed;
Equipment |
Components |
Q'ty |
1. Malt miller |
*1000~1200kg/hr |
1set |
2. Brewhouse unit |
*Mash/lauter tun with VFD grain rake |
1set |
*Kettle/whirlpool tun |
1set |
|
*10000L Hot liquor tank |
1set |
|
*Non-slip Work Plateform |
1set |
|
*Sanitary Centrifugal Pump |
2sets |
|
*Wort balance column |
1set |
|
*50M2 Heat Exchanger [304SS NANHUA] |
1set |
|
*Inline Pipe Filter |
1set |
|
*Wort Aeration Station |
1set |
|
3.Fermenting System |
*5000L Fermentation Tank |
6sets |
*Carbonation port and stone |
Optional |
|
*Bunging valves[0.2-2.2bar] |
Optional |
|
4. Cooling System |
*Glycol water tank 5000L |
1set |
*Cold liquor tank 10000L |
1set |
|
*Glycol chiller 20HP |
2sets |
|
*Glycol water pump |
1set |
|
*Pipeline |
1set |
|
5. Control unit |
*Brewhouse Control Cabinet |
1set |
*Fermentation Control Cabinet |
1set |
|
5. CIP System |
*Caustic tank |
1set |
*Sterilization Tank |
1set |
|
*Acid tank |
1set |
|
6. Beer Filling System |
*Bottle filling and washing machine |
Optional |
*Keg filling and washing machine |
Optional |
|
*Capping machine |
Optional |
I. Grain miller
Function: Grain crushing
Type: Double roller
Drive Power: 1.5kw
Output: 1000~1200kg/hr
Roller Size: Φ155x200mm
Roller type: Speed differential double roller
Faster Roller Speed: 700rpm
Crushing Particle Size: Adjustable
II. Brewhouse unit
5000L Mash/ lauter tun: Insulated, with false bottom, grain rake, sight glass
5000L kettle/whirlpool tun: Insulated, tangential whirlpool inlet
5000L hot water tank: Insulated, recyled water inlet, recirculation port
Plate heat exchanger: 50m2, SUS304, two stages
Work platform: Yes
Wort pump: 10t/hr,
Hot water pump: 10t/hr,
Wort aeration device: Yes
Brewhouse control panel: PID, temperature display and control
Fittings, Butterfly valves, stainless steel hard piping, wort hose, fittings etc
III. Beer fermenters
Fermenter capacity: 5000L
Function: Wort Fermentation or maturation
Interior Shell: SUS304 full welded; TH=3mm
Exterior Shell:SUS304 full welded; TH=2mm
100% TIG welding with pure argon gas shield
Interior Finish: Overall polishing to 0.2~0.4 μm without dead corner
Insulation: Polyurethane; TH=80mm
Glycol Jacket: Dimpled plate on cone and side
Standard vacuum relief valve at 2 bar
Horizontal rotating racking arm
IV. Glycol cooling system
Glycol water tank: 5000L
Cold liquor tank:10000L
Glycol chiller: 2x20HP
Glycol water pump: Included
Pipeline: Included
V. Control unit
Function: Brewhouse, fermenter, BBT, glycol chilling unit, CIP controlling
Assembling Style: Floor Type/Wall hanging
Electrical Parts : World wide brand CE certificated
Exterior Shell: SUS304 full welded; TH=2mm
Category Instrument Panel; PLC Panel with Touch Screen
VI. CIP cart
Capacity: 300L
Function: Clean in place for tanks
Structure Caustic Tank+ Sterilization Tank
Shell SUS304 full welded; TH=2mm
Interior Finish Polish: 0.4~0.6 μm
Q: How long does it take to deliver a brewery?
Typically it takes about 1-3 months to manufacture a brewery. Depending on the size of the brewery, the amount of custom designed equipment, our general workload and the way of shipping,this period can be shorter or longer.
Q: How long does the equipment last?
Given the fact that most elements in a brewery are made of stainless steel, the longevity of a brewery is high. Given proper maintenance and the careful use of chemicals, a brewery can be used intensively for about 20 to 30 years. For some elements such as fillers and labelers with a lot of moving parts a shorter lifespan should be considered and more maintenance will be necessary, depending on the use.
Q: Can you help me with my entire brewery project or are there aspects you do not cover?
Our mission is to assist our clients with their brewing needs from start to finish and build a long-term relationship with them. We can help you with all aspects of your brewing need or work with one of our partners to accommodate your needs.
Q: Can I brew all types of beer on the TIANTAI beer equipment?
Contrary to the open-vessel fermentation system mainly used in Eastern Europe and Germany, all beer styles can be brewed with our system. This means that a wide variety of ales and lagers can be made. Given the infectious style of Lambics, we do not recommend brewing or packaging these beers on shared equipment.
We have more than 15 years experience about designing, manufacturing, installing and training the beer brewery equipment. We have exported to USA, Canada, Brazil, Korea, Australia, Italy, Spain, Belgium, South Africa etc. All of our beer equipment details are taken the humanized and brewmasters’ intention into consideration. Reliable quality is guaranteed by certificated raw material, professional technical support, advanced processing equipment, strict quality control and complete personal training etc. We always keep our system affordable which will support more brew masters to approach their brewing dream.
コンタクトパーソン : | Andy Liu |
---|